About this bridge

RTE 121 over Titicus River is a prestressed concrete box beam or girders - multiple carrying RTE 121 over Titicus River in Westchester County, New York. It was built in 1958, so it is 67 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 3,362 vehicles a day, roughly 4% of them trucks, projected to reach 4,084 by 2041. The structure is 81 ft (24.7 m) long and 39 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesRTE 121
CrossesTiticus River
Location1.0 MI S JCT Rts 121+116
RouteState Highway 121
Coordinates41.32772, -73.58065
Functional classUrban Minor Arterial

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.1 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckNot applicable
Main spans1
Design loadH 20
Structure length81 ft (24.7 m)
Longest span74 ft (22.5 m)
Deck width39 ft (12 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,362 (2017)
Projected traffic4,084 by 2041
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedDeck replacement with only incidental widening
Estimated improvement cost$2.7 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was RTE 121 over Titicus River built?

It was built in 1958, making it 67 years old in 2025.

What condition is RTE 121 over Titicus River in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in April 2024.

How much traffic does RTE 121 over Titicus River carry?

About 3,362 vehicles per day (2017 count), of which roughly 4% are trucks.

How long is RTE 121 over Titicus River?

The structure is 81 ft (24.7 m) long with a longest span of 74 ft (22.5 m) and a deck 39 ft wide.

Who owns RTE 121 over Titicus River?

It is owned by the State Highway Agency.