Whitbeck Road over Erie Canalway Trail Eri
GoodWayne County, New York · 7MI E. Inters Rts 21 & 31 · Structure no. 000000004437150
- Built
- 1990
- 35 years old
- Condition
- Good
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 210 ft
- 3 main spans
- Daily traffic
- 4,181
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Whitbeck Road over Erie Canalway Trail Eri is a steel continuous stringer/multi-beam or girder carrying Whitbeck Road over Erie Canalway Trail Eri in Wayne County, New York. It was built in 1990, so it is 35 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,181 vehicles a day, roughly 7% of them trucks, projected to reach 5,853 by 2041. The structure is 210 ft (64 m) long and 36 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Whitbeck Road over Erie Canalway Trail Eri built?
It was built in 1990, making it 35 years old in 2025.
What condition is Whitbeck Road over Erie Canalway Trail Eri in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Whitbeck Road over Erie Canalway Trail Eri carry?
About 4,181 vehicles per day (2021 count), of which roughly 7% are trucks.
How long is Whitbeck Road over Erie Canalway Trail Eri?
The structure is 210 ft (64 m) long with a longest span of 95 ft (28.9 m) and a deck 36 ft wide.
Who owns Whitbeck Road over Erie Canalway Trail Eri?
It is owned by the State Highway Agency.