Arcadia Zuric RD over Salmon Creek
GoodWayne County, New York · 3.8 MI South of Sodus · Structure no. 000000003314710
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected July 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 67 ft
- 1 main span
- Daily traffic
- 520
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Arcadia Zuric RD over Salmon Creek is a prestressed concrete box beam or girders - multiple carrying Arcadia Zuric RD over Salmon Creek in Wayne County, New York. It was built in 2013, so it is 12 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 520 vehicles a day, roughly 18% of them trucks, projected to reach 728 by 2041. The structure is 67 ft (20.4 m) long and 33 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Arcadia Zuric RD over Salmon Creek built?
It was built in 2013, making it 12 years old in 2025.
What condition is Arcadia Zuric RD over Salmon Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Arcadia Zuric RD over Salmon Creek carry?
About 520 vehicles per day (2021 count), of which roughly 18% are trucks.
How long is Arcadia Zuric RD over Salmon Creek?
The structure is 67 ft (20.4 m) long with a longest span of 64 ft (19.5 m) and a deck 33 ft wide.
Who owns Arcadia Zuric RD over Salmon Creek?
It is owned by the County Highway Agency.