Mattison Road over Halfway Brook
GoodWashington County, New York · 2 MI SW Fort Ann · Structure no. 000000003306000
- Built
- 1942
- 83 years old, rebuilt 2001
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 44 ft
- 1 main span
- Daily traffic
- 90
- 2017 count
- Owner
- County
- County Highway Agency
About this bridge
Mattison Road over Halfway Brook is a steel stringer/multi-beam or girder carrying Mattison Road over Halfway Brook in Washington County, New York. It was built in 1942 and reconstructed in 2001, so it is 83 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 90 vehicles a day, roughly 10% of them trucks, projected to reach 126 by 2037. The structure is 44 ft (13.4 m) long and 26 ft wide. If it were closed, the detour would be 7.5 mi (12 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mattison Road over Halfway Brook built?
It was built in 1942, making it 83 years old in 2025. It was reconstructed in 2001.
What condition is Mattison Road over Halfway Brook in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does Mattison Road over Halfway Brook carry?
About 90 vehicles per day (2017 count), of which roughly 10% are trucks.
How long is Mattison Road over Halfway Brook?
The structure is 44 ft (13.4 m) long with a longest span of 39 ft (11.8 m) and a deck 26 ft wide.
Who owns Mattison Road over Halfway Brook?
It is owned by the County Highway Agency.