Brayton Avenue over Bike Path Feeder Canal
FairWarren County, New York · .2 MI W JCT SH 32 & SH254 · Structure no. 000000004417050
- Built
- 1930
- 95 years old, rebuilt 2020
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 58 ft
- 1 main span
- Daily traffic
- 44
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Brayton Avenue over Bike Path Feeder Canal is a steel stringer/multi-beam or girder carrying Brayton Avenue over Bike Path Feeder Canal in Warren County, New York. It was built in 1930 and reconstructed in 2020, so it is 95 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 44 vehicles a day, roughly 5% of them trucks, projected to reach 62 by 2037. The structure is 58 ft (17.7 m) long and 19 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Brayton Avenue over Bike Path Feeder Canal built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 2020.
What condition is Brayton Avenue over Bike Path Feeder Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Brayton Avenue over Bike Path Feeder Canal carry?
About 44 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Brayton Avenue over Bike Path Feeder Canal?
The structure is 58 ft (17.7 m) long with a longest span of 51 ft (15.5 m) and a deck 19 ft wide.
Who owns Brayton Avenue over Bike Path Feeder Canal?
It is owned by the State Highway Agency.