US Bridges

RTE 28 over Glen Creek

Good

Warren County, New York · 0.3 MI NW JCT 28& Hudsonr · Structure no. 000000001020360

Built
2007
18 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
118 ft
1 main span
Daily traffic
2,838
2020 count
Owner
State
State Highway Agency

About this bridge

RTE 28 over Glen Creek is a steel stringer/multi-beam or girder carrying RTE 28 over Glen Creek in Warren County, New York. It was built in 2007, so it is 18 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,838 vehicles a day, roughly 9% of them trucks, projected to reach 3,026 by 2041. The structure is 118 ft (36 m) long and 37 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesRTE 28
CrossesGlen Creek
Location0.3 MI NW JCT 28& Hudsonr
RouteState Highway 28
Coordinates43.58504, -73.86408
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating98.1 US tons
Inventory rating58.4 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length118 ft (36 m)
Longest span112 ft (34 m)
Deck width37 ft (11.2 m)
Roadway width33 ft (10.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,838 (2020)
Projected traffic3,026 by 2041
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$2.3 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was RTE 28 over Glen Creek built?

It was built in 2007, making it 18 years old in 2025.

What condition is RTE 28 over Glen Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does RTE 28 over Glen Creek carry?

About 2,838 vehicles per day (2020 count), of which roughly 9% are trucks.

How long is RTE 28 over Glen Creek?

The structure is 118 ft (36 m) long with a longest span of 112 ft (34 m) and a deck 37 ft wide.

Who owns RTE 28 over Glen Creek?

It is owned by the State Highway Agency.