Oregon Trail over Verkeerder Kill
GoodUlster County, New York · 3 MI NE of Walker Valley · Structure no. 000000003346400
- Built
- 2001
- 24 years old, rebuilt 2021
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 35 ft
- 1 main span
- Daily traffic
- 526
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Oregon Trail over Verkeerder Kill is a steel stringer/multi-beam or girder carrying Oregon Trail over Verkeerder Kill in Ulster County, New York. It was built in 2001 and reconstructed in 2021, so it is 24 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 526 vehicles a day, roughly 7% of them trucks, projected to reach 736 by 2039. The structure is 35 ft (10.7 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Oregon Trail over Verkeerder Kill built?
It was built in 2001, making it 24 years old in 2025. It was reconstructed in 2021.
What condition is Oregon Trail over Verkeerder Kill in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does Oregon Trail over Verkeerder Kill carry?
About 526 vehicles per day (2019 count), of which roughly 7% are trucks.
How long is Oregon Trail over Verkeerder Kill?
The structure is 35 ft (10.7 m) long with a longest span of 34 ft (10.3 m) and a deck 26 ft wide.
Who owns Oregon Trail over Verkeerder Kill?
It is owned by the County Highway Agency.