RTE 38 over East Br Owego Crk
FairTioga County, New York · 1.6 MI NW of Berkshire · Structure no. 000000001024130
- Built
- 1987
- 38 years old
- Condition
- Fair
- inspected September 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 134 ft
- 2 main spans
- Daily traffic
- 3,029
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 38 over East Br Owego Crk is a prestressed concrete continuous box beam or girders - multiple carrying RTE 38 over East Br Owego Crk in Tioga County, New York. It was built in 1987, so it is 38 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,029 vehicles a day, roughly 12% of them trucks, projected to reach 3,047 by 2041. The structure is 134 ft (40.8 m) long and 42 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 38 over East Br Owego Crk built?
It was built in 1987, making it 38 years old in 2025.
What condition is RTE 38 over East Br Owego Crk in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does RTE 38 over East Br Owego Crk carry?
About 3,029 vehicles per day (2019 count), of which roughly 12% are trucks.
How long is RTE 38 over East Br Owego Crk?
The structure is 134 ft (40.8 m) long with a longest span of 64 ft (19.5 m) and a deck 42 ft wide.
Who owns RTE 38 over East Br Owego Crk?
It is owned by the State Highway Agency.