US Bridges

RTE 55 over Halfway Brook

Fair

Sullivan County, New York · 1.3 MI S of Eldred · Structure no. 000000003359680

Built
1989
36 years old
Condition
Fair
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
50 ft
1 main span
Daily traffic
429
2020 count
Owner
County
County Highway Agency

About this bridge

RTE 55 over Halfway Brook is a steel stringer/multi-beam or girder carrying RTE 55 over Halfway Brook in Sullivan County, New York. It was built in 1989, so it is 36 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 429 vehicles a day, roughly 14% of them trucks, projected to reach 601 by 2040. The structure is 50 ft (15.2 m) long and 31 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesRTE 55
CrossesHalfway Brook
Location1.3 MI S of Eldred
RouteState Highway 55
Coordinates41.51064, -74.88667
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating37.8 US tons
Inventory rating29.3 US tons

Structure

MaterialSteel
DeckCorrugated steel
Main spans1
Design loadHS 20
Structure length50 ft (15.2 m)
Longest span48 ft (14.6 m)
Deck width31 ft (9.3 m)
Roadway width29 ft (8.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic429 (2020)
Projected traffic601 by 2040
Trucks14%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$1.1 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was RTE 55 over Halfway Brook built?

It was built in 1989, making it 36 years old in 2025.

What condition is RTE 55 over Halfway Brook in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does RTE 55 over Halfway Brook carry?

About 429 vehicles per day (2020 count), of which roughly 14% are trucks.

How long is RTE 55 over Halfway Brook?

The structure is 50 ft (15.2 m) long with a longest span of 48 ft (14.6 m) and a deck 31 ft wide.

Who owns RTE 55 over Halfway Brook?

It is owned by the County Highway Agency.