RTE 27 over Canal Road East Shinnec
FairSuffolk County, New York · 2 MI E JCT SH 24 & SH 27 · Structure no. 000000001019439
- Built
- 1960
- 65 years old, rebuilt 1999
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 369 ft
- 3 main spans
- Daily traffic
- 39,182
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 27 over Canal Road East Shinnec is a steel stringer/multi-beam or girder carrying RTE 27 over Canal Road East Shinnec in Suffolk County, New York. It was built in 1960 and reconstructed in 1999, so it is 65 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 39,182 vehicles a day, roughly 6% of them trucks, projected to reach 46,606 by 2041. The structure is 369 ft (112.5 m) long and 91 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 27 over Canal Road East Shinnec built?
It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1999.
What condition is RTE 27 over Canal Road East Shinnec in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does RTE 27 over Canal Road East Shinnec carry?
About 39,182 vehicles per day (2019 count), of which roughly 6% are trucks.
How long is RTE 27 over Canal Road East Shinnec?
The structure is 369 ft (112.5 m) long with a longest span of 164 ft (49.9 m) and a deck 91 ft wide.
Who owns RTE 27 over Canal Road East Shinnec?
It is owned by the State Highway Agency.