County Road 24 over Trib Helmer Creek
FairSteuben County, New York · 1.1 MI E of Cameron Mills · Structure no. 000000003333300
- Built
- 1937
- 88 years old, rebuilt 1991
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 35 ft
- 1 main span
- Daily traffic
- 434
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 24 over Trib Helmer Creek is a steel stringer/multi-beam or girder carrying County Road 24 over Trib Helmer Creek in Steuben County, New York. It was built in 1937 and reconstructed in 1991, so it is 88 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 434 vehicles a day, roughly 8% of them trucks, projected to reach 452 by 2041. The structure is 35 ft (10.7 m) long and 30 ft wide. If it were closed, the detour would be 10.6 mi (17 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 24 over Trib Helmer Creek built?
It was built in 1937, making it 88 years old in 2025. It was reconstructed in 1991.
What condition is County Road 24 over Trib Helmer Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does County Road 24 over Trib Helmer Creek carry?
About 434 vehicles per day (2018 count), of which roughly 8% are trucks.
How long is County Road 24 over Trib Helmer Creek?
The structure is 35 ft (10.7 m) long with a longest span of 33 ft (10 m) and a deck 30 ft wide.
Who owns County Road 24 over Trib Helmer Creek?
It is owned by the County Highway Agency.