US Bridges

County Road 115 over Canisteo River

Good

Steuben County, New York · 0.4 MI S of Int. With Nys · Structure no. 000000003255800

Built
2022
3 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
237 ft
2 main spans
Daily traffic
2,007
2017 count
Owner
County
County Highway Agency

About this bridge

County Road 115 over Canisteo River is a steel continuous stringer/multi-beam or girder carrying County Road 115 over Canisteo River in Steuben County, New York. It was built in 2022, so it is 3 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,007 vehicles a day, roughly 19% of them trucks, projected to reach 2,810 by 2037. The structure is 237 ft (72.2 m) long and 33 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCounty Road 115
CrossesCanisteo River
Location0.4 MI S of Int. With Nys
RouteCounty Highway 0
Coordinates42.10661, -77.14555
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation9: Superior to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating87 US tons
Inventory rating52 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length237 ft (72.2 m)
Longest span118 ft (36 m)
Deck width33 ft (10.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deck107 ft (32.7 m)

Traffic and service

Average daily traffic2,007 (2017)
Projected traffic2,810 by 2037
Trucks19%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$4.1 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was County Road 115 over Canisteo River built?

It was built in 2022, making it 3 years old in 2025.

What condition is County Road 115 over Canisteo River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does County Road 115 over Canisteo River carry?

About 2,007 vehicles per day (2017 count), of which roughly 19% are trucks.

How long is County Road 115 over Canisteo River?

The structure is 237 ft (72.2 m) long with a longest span of 118 ft (36 m) and a deck 33 ft wide.

Who owns County Road 115 over Canisteo River?

It is owned by the County Highway Agency.