US Bridges

East Main Street over Chauncy Run

Good

Steuben County, New York · 0.7 MI SE of Int. With Ny · Structure no. 000000002218170

Built
2020
5 years old
Condition
Good
inspected November 2024
Type
Slab
Concrete
Length
40 ft
1 main span
Daily traffic
4,512
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

East Main Street over Chauncy Run is a concrete slab carrying East Main Street over Chauncy Run in Steuben County, New York. It was built in 2020, so it is 5 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,512 vehicles a day, roughly 3% of them trucks, projected to reach 5,582 by 2041. The structure is 40 ft (12.2 m) long and 47 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesEast Main Street
CrossesChauncy Run
Location0.7 MI SE of Int. With Ny
RouteCity Street 0
Coordinates42.32299, -77.65103
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating84 US tons
Inventory rating50 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length40 ft (12.2 m)
Longest span33 ft (10.1 m)
Deck width47 ft (14.3 m)
Roadway width31 ft (9.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,512 (2018)
Projected traffic5,582 by 2041
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$1.4 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was East Main Street over Chauncy Run built?

It was built in 2020, making it 5 years old in 2025.

What condition is East Main Street over Chauncy Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does East Main Street over Chauncy Run carry?

About 4,512 vehicles per day (2018 count), of which roughly 3% are trucks.

How long is East Main Street over Chauncy Run?

The structure is 40 ft (12.2 m) long with a longest span of 33 ft (10.1 m) and a deck 47 ft wide.

Who owns East Main Street over Chauncy Run?

It is owned by the City or Municipal Highway Agency.