RTE 54A over Wagener Glen Creek
FairSteuben County, New York · 1 MI NE Pulteney RTE 54A · Structure no. 000000001026990
- Built
- 1978
- 47 years old
- Condition
- Fair
- inspected March 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 56 ft
- 1 main span
- Daily traffic
- 549
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 54A over Wagener Glen Creek is a prestressed concrete box beam or girders - multiple carrying RTE 54A over Wagener Glen Creek in Steuben County, New York. It was built in 1978, so it is 47 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 549 vehicles a day, roughly 7% of them trucks, projected to reach 572 by 2041. The structure is 56 ft (17.1 m) long and 38 ft wide. If it were closed, the detour would be 42.9 mi (69 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 54A over Wagener Glen Creek built?
It was built in 1978, making it 47 years old in 2025.
What condition is RTE 54A over Wagener Glen Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does RTE 54A over Wagener Glen Creek carry?
About 549 vehicles per day (2020 count), of which roughly 7% are trucks.
How long is RTE 54A over Wagener Glen Creek?
The structure is 56 ft (17.1 m) long with a longest span of 54 ft (16.4 m) and a deck 38 ft wide.
Who owns RTE 54A over Wagener Glen Creek?
It is owned by the State Highway Agency.