RTE 352 over Trolley Lane
FairSteuben County, New York · 0.3 MI E of Corning · Structure no. 000000001012720
- Built
- 1949
- 76 years old, rebuilt 1990
- Condition
- Fair
- inspected March 2023
- Type
- Box Beam or Girders - Multiple
- Concrete
- Length
- 45 ft
- 1 main span
- Daily traffic
- 10,244
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 352 over Trolley Lane is a concrete box beam or girders - multiple carrying RTE 352 over Trolley Lane in Steuben County, New York. It was built in 1949 and reconstructed in 1990, so it is 76 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,244 vehicles a day, roughly 3% of them trucks, projected to reach 10,292 by 2041. The structure is 45 ft (13.7 m) long and 71 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 352 over Trolley Lane built?
It was built in 1949, making it 76 years old in 2025. It was reconstructed in 1990.
What condition is RTE 352 over Trolley Lane in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does RTE 352 over Trolley Lane carry?
About 10,244 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is RTE 352 over Trolley Lane?
The structure is 45 ft (13.7 m) long with a longest span of 44 ft (13.4 m) and a deck 71 ft wide.
Who owns RTE 352 over Trolley Lane?
It is owned by the State Highway Agency and maintained by the Private (other than railroad).