County Road 2 over Mill Creek
GoodSchoharie County, New York · 0.2 MI NW of JCT SR30 & C · Structure no. 000000003355260
- Built
- 1995
- 30 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 55 ft
- 1 main span
- Daily traffic
- 266
- 2017 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 2 over Mill Creek is a steel stringer/multi-beam or girder carrying County Road 2 over Mill Creek in Schoharie County, New York. It was built in 1995, so it is 30 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 266 vehicles a day, roughly 4% of them trucks, projected to reach 372 by 2037. The structure is 55 ft (16.8 m) long and 26 ft wide. If it were closed, the detour would be 17.4 mi (28 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 2 over Mill Creek built?
It was built in 1995, making it 30 years old in 2025.
What condition is County Road 2 over Mill Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does County Road 2 over Mill Creek carry?
About 266 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is County Road 2 over Mill Creek?
The structure is 55 ft (16.8 m) long with a longest span of 50 ft (15.2 m) and a deck 26 ft wide.
Who owns County Road 2 over Mill Creek?
It is owned by the County Highway Agency.