US Bridges

East High Street over 87I 87I15091145 RTE I87

Good

Saratoga County, New York · 1.7 MI N JCT I87 & SH 67 · Structure no. 000000001033300

Built
2018
7 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
302 ft
2 main spans
Daily traffic
3,209
2020 count
Owner
State
State Highway Agency

About this bridge

East High Street over 87I 87I15091145 RTE I87 is a steel stringer/multi-beam or girder carrying East High Street over 87I 87I15091145 RTE I87 in Saratoga County, New York. It was built in 2018, so it is 7 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,209 vehicles a day, roughly 4% of them trucks, projected to reach 4,493 by 2040. The structure is 302 ft (92 m) long and 36 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesEast High Street
Crosses87I 87I15091145 RTE I87
Location1.7 MI N JCT I87 & SH 67
Coordinates42.99557, -73.80328
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating97 US tons
Inventory rating58 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length302 ft (92 m)
Longest span150 ft (45.7 m)
Deck width36 ft (11 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,209 (2020)
Projected traffic4,493 by 2040
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$4.9 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was East High Street over 87I 87I15091145 RTE I87 built?

It was built in 2018, making it 7 years old in 2025.

What condition is East High Street over 87I 87I15091145 RTE I87 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does East High Street over 87I 87I15091145 RTE I87 carry?

About 3,209 vehicles per day (2020 count), of which roughly 4% are trucks.

How long is East High Street over 87I 87I15091145 RTE I87?

The structure is 302 ft (92 m) long with a longest span of 150 ft (45.7 m) and a deck 36 ft wide.

Who owns East High Street over 87I 87I15091145 RTE I87?

It is owned by the State Highway Agency.