US Bridges

Bloomingdale Road over RTE 909C RTE 909C

Fair

Richmond County, New York · .7 MI E JCT440+W Shore Ex · Structure no. 000000001067500

Built
1972
53 years old
Condition
Fair
inspected January 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
188 ft
2 main spans
Daily traffic
8,301
2020 count
Owner
State
State Highway Agency

About this bridge

Bloomingdale Road over RTE 909C RTE 909C is a steel stringer/multi-beam or girder carrying Bloomingdale Road over RTE 909C RTE 909C in Richmond County, New York. It was built in 1972, so it is 53 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 8,301 vehicles a day, roughly 6% of them trucks, projected to reach 10,084 by 2041. The structure is 188 ft (57.3 m) long and 74 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesBloomingdale Road
CrossesRTE 909C RTE 909C
Location.7 MI E JCT440+W Shore Ex
RouteCity Street 0
Coordinates40.52839, -74.21673
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating92 US tons
Inventory rating55 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length188 ft (57.3 m)
Longest span93 ft (28.3 m)
Deck width74 ft (22.6 m)
Roadway width50 ft (15.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,301 (2020)
Projected traffic10,084 by 2041
Trucks6%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$13.6 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Bloomingdale Road over RTE 909C RTE 909C built?

It was built in 1972, making it 53 years old in 2025.

What condition is Bloomingdale Road over RTE 909C RTE 909C in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does Bloomingdale Road over RTE 909C RTE 909C carry?

About 8,301 vehicles per day (2020 count), of which roughly 6% are trucks.

How long is Bloomingdale Road over RTE 909C RTE 909C?

The structure is 188 ft (57.3 m) long with a longest span of 93 ft (28.3 m) and a deck 74 ft wide.

Who owns Bloomingdale Road over RTE 909C RTE 909C?

It is owned by the State Highway Agency.