CR7 over Moordener Kill
FairRensselaer County, New York · 0.2M S CR7&RT150 E Schodk · Structure no. 000000003303920
- Built
- 1990
- 35 years old
- Condition
- Fair
- inspected July 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 51 ft
- 1 main span
- Daily traffic
- 2,174
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
CR7 over Moordener Kill is a prestressed concrete box beam or girders - multiple carrying CR7 over Moordener Kill in Rensselaer County, New York. It was built in 1990, so it is 35 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,174 vehicles a day, roughly 6% of them trucks, projected to reach 3,162 by 2041. The structure is 51 ft (15.5 m) long and 30 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR7 over Moordener Kill built?
It was built in 1990, making it 35 years old in 2025.
What condition is CR7 over Moordener Kill in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does CR7 over Moordener Kill carry?
About 2,174 vehicles per day (2020 count), of which roughly 6% are trucks.
How long is CR7 over Moordener Kill?
The structure is 51 ft (15.5 m) long with a longest span of 45 ft (13.7 m) and a deck 30 ft wide.
Who owns CR7 over Moordener Kill?
It is owned by the County Highway Agency.