- Built
- 2013
- 12 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 183 ft
- 1 main span
- Daily traffic
- 10,189
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
RTE I90 over Moordener Kill is a steel stringer/multi-beam or girder carrying RTE I90 over Moordener Kill in Rensselaer County, New York. It was built in 2013, so it is 12 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10,189 vehicles a day, roughly 14% of them trucks, projected to reach 16,146 by 2041. The structure is 183 ft (55.8 m) long and 57 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I90 over Moordener Kill built?
It was built in 2013, making it 12 years old in 2025.
What condition is RTE I90 over Moordener Kill in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does RTE I90 over Moordener Kill carry?
About 10,189 vehicles per day (2021 count), of which roughly 14% are trucks.
How long is RTE I90 over Moordener Kill?
The structure is 183 ft (55.8 m) long with a longest span of 181 ft (55.2 m) and a deck 57 ft wide.
Who owns RTE I90 over Moordener Kill?
It is owned by the State Highway Agency.