US Bridges

RTE 7 over Hoosic Overflow

Good

Rensselaer County, New York · Rt 7 0.5 MI SE Hoosick · Structure no. 000000001004320

Built
2023
2 years old
Condition
Good
inspected February 2023
Type
Culvert
Concrete
Length
30 ft
1 main span
Daily traffic
7,973
2015 count
Owner
State
State Highway Agency

About this bridge

RTE 7 over Hoosic Overflow is a concrete culvert carrying RTE 7 over Hoosic Overflow in Rensselaer County, New York. It was built in 2023, so it is 2 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,973 vehicles a day, roughly 10% of them trucks, projected to reach 8,932 by 2041. The structure is 30 ft (9.1 m) long. If it were closed, the detour would be 5.6 mi (9 km).

CarriesRTE 7
CrossesHoosic Overflow
LocationRt 7 0.5 MI SE Hoosick
RouteState Highway 7
Coordinates42.85941, -73.33556
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating85.6 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span24 ft (7.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deck107 ft (32.7 m)

Traffic and service

Average daily traffic7,973 (2015)
Projected traffic8,932 by 2041
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5.6 mi (9 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$374,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was RTE 7 over Hoosic Overflow built?

It was built in 2023, making it 2 years old in 2025.

What condition is RTE 7 over Hoosic Overflow in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does RTE 7 over Hoosic Overflow carry?

About 7,973 vehicles per day (2015 count), of which roughly 10% are trucks.

How long is RTE 7 over Hoosic Overflow?

The structure is 30 ft (9.1 m) long with a longest span of 24 ft (7.3 m).

Who owns RTE 7 over Hoosic Overflow?

It is owned by the State Highway Agency.