US Bridges

RTE 2 over Poesten Kill

Good

Rensselaer County, New York · RTE 2 at Eagle Mills · Structure no. 000000001000200

Built
2006
19 years old
Condition
Good
inspected May 2024
Type
Arch - Deck
Concrete
Length
62 ft
1 main span
Daily traffic
4,894
2020 count
Owner
State
State Highway Agency

About this bridge

RTE 2 over Poesten Kill is a concrete arch - deck carrying RTE 2 over Poesten Kill in Rensselaer County, New York. It was built in 2006, so it is 19 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,894 vehicles a day, roughly 9% of them trucks, projected to reach 4,917 by 2041. The structure is 62 ft (18.9 m) long and 45 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesRTE 2
CrossesPoesten Kill
LocationRTE 2 at Eagle Mills
RouteU.S. Route 2
Coordinates42.72899, -73.60304
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating110.1 US tons
Inventory rating110.1 US tons

Structure

Structure typeArch - Deck
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length62 ft (18.9 m)
Longest span60 ft (18.3 m)
Deck width45 ft (13.6 m)
Roadway width30 ft (9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,894 (2020)
Projected traffic4,917 by 2041
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$2.2 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was RTE 2 over Poesten Kill built?

It was built in 2006, making it 19 years old in 2025.

What condition is RTE 2 over Poesten Kill in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does RTE 2 over Poesten Kill carry?

About 4,894 vehicles per day (2020 count), of which roughly 9% are trucks.

How long is RTE 2 over Poesten Kill?

The structure is 62 ft (18.9 m) long with a longest span of 60 ft (18.3 m) and a deck 45 ft wide.

Who owns RTE 2 over Poesten Kill?

It is owned by the State Highway Agency.