US Bridges

Jfkia Term 5 Dept over Jfkia Terminal 5 Arrival

Fair

Queens County, New York · Jfkia Term 5 Dept. · Structure no. 000000005524940

Built
2008
17 years old
Condition
Fair
inspected August 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
1,430 ft
13 main spans
Daily traffic
2,008
2009 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Jfkia Term 5 Dept over Jfkia Terminal 5 Arrival is a prestressed concrete box beam or girders - multiple carrying Jfkia Term 5 Dept over Jfkia Terminal 5 Arrival in Queens County, New York. It was built in 2008, so it is 17 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,008 vehicles a day, projected to reach 2,811 by 2029. The structure is 1,430 ft (435.9 m) long and 33 ft wide.

CarriesJfkia Term 5 Dept
CrossesJfkia Terminal 5 Arrival
LocationJfkia Term 5 Dept.
RouteCity Street 0
Coordinates40.64467, -73.77703
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82.1 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans13 (+11 approach)
Design loadHS 20
Structure length1,430 ft (435.9 m)
Longest span126 ft (38.4 m)
Deck width33 ft (10.1 m)
Roadway width28 ft (8.4 m)
Vertical clearance over deck17 ft (5.3 m)

Traffic and service

Average daily traffic2,008 (2009)
Projected traffic2,811 by 2029
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$31 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Jfkia Term 5 Dept over Jfkia Terminal 5 Arrival built?

It was built in 2008, making it 17 years old in 2025.

What condition is Jfkia Term 5 Dept over Jfkia Terminal 5 Arrival in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Jfkia Term 5 Dept over Jfkia Terminal 5 Arrival carry?

About 2,008 vehicles per day (2009 count).

How long is Jfkia Term 5 Dept over Jfkia Terminal 5 Arrival?

The structure is 1,430 ft (435.9 m) long with a longest span of 126 ft (38.4 m) and a deck 33 ft wide.

Who owns Jfkia Term 5 Dept over Jfkia Terminal 5 Arrival?

It is owned by the Local Toll Authority.