US Bridges

Delta Ground to Cd over Taxi Roadway Roadway to

Good

Queens County, New York · At LA Guardia Airport · Structure no. 00000000552229B

Built
2020
5 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
377 ft
4 main spans
Daily traffic
—
2024 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Delta Ground to Cd over Taxi Roadway Roadway to is a steel stringer/multi-beam or girder carrying Delta Ground to Cd over Taxi Roadway Roadway to in Queens County, New York. It was built in 2020, so it is 5 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

No traffic count is recorded. The structure is 377 ft (114.9 m) long and 24 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesDelta Ground to Cd
CrossesTaxi Roadway Roadway to
LocationAt LA Guardia Airport
Coordinates40.77046, -73.86786
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating93.3 US tons
Inventory rating45 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length377 ft (114.9 m)
Longest span132 ft (40.2 m)
Deck width24 ft (7.3 m)
Roadway width21 ft (6.4 m)
Vertical clearance over deck18 ft (5.5 m)

Traffic and service

Average daily traffic—
Projected traffic—
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$7 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Delta Ground to Cd over Taxi Roadway Roadway to built?

It was built in 2020, making it 5 years old in 2025.

What condition is Delta Ground to Cd over Taxi Roadway Roadway to in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Delta Ground to Cd over Taxi Roadway Roadway to carry?

No traffic count is recorded for this structure.

How long is Delta Ground to Cd over Taxi Roadway Roadway to?

The structure is 377 ft (114.9 m) long with a longest span of 132 ft (40.2 m) and a deck 24 ft wide.

Who owns Delta Ground to Cd over Taxi Roadway Roadway to?

It is owned by the Local Toll Authority.