US Bridges

RTE I278 over Relief

Fair

Queens County, New York · 278I Bronx to Manhattan · Structure no. 00000000552188B

Built
2001
24 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
363 ft
6 main spans
Daily traffic
—
2018 count
Owner
Toll Authority
Local Toll Authority

About this bridge

RTE I278 over Relief is a steel continuous stringer/multi-beam or girder carrying RTE I278 over Relief in Queens County, New York. It was built in 2001, so it is 24 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

No traffic count is recorded. The structure is 363 ft (110.6 m) long and 45 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesRTE I278
CrossesRelief
Location278I Bronx to Manhattan
Coordinates40.79746, -73.92061
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating71 US tons
Inventory rating47 US tons

Structure

MaterialSteel Continuous
DeckOther
Main spans6
Design loadUnknown
Structure length363 ft (110.6 m)
Longest span64 ft (19.5 m)
Deck width45 ft (13.8 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic—
Projected traffic—
Trucks8%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed9.9 mi (16 km)
TollToll bridge
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusHistorical significance not determinable at this time
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$14.2 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was RTE I278 over Relief built?

It was built in 2001, making it 24 years old in 2025.

What condition is RTE I278 over Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does RTE I278 over Relief carry?

No traffic count is recorded for this structure.

How long is RTE I278 over Relief?

The structure is 363 ft (110.6 m) long with a longest span of 64 ft (19.5 m) and a deck 45 ft wide.

Who owns RTE I278 over Relief?

It is owned by the Local Toll Authority.