RTE I278 over Relief
FairQueens County, New York · 278I Bronx to Manhattan · Structure no. 00000000552188B
- Built
- 2001
- 24 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 363 ft
- 6 main spans
- Daily traffic
- —
- 2018 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
RTE I278 over Relief is a steel continuous stringer/multi-beam or girder carrying RTE I278 over Relief in Queens County, New York. It was built in 2001, so it is 24 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
No traffic count is recorded. The structure is 363 ft (110.6 m) long and 45 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I278 over Relief built?
It was built in 2001, making it 24 years old in 2025.
What condition is RTE I278 over Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does RTE I278 over Relief carry?
No traffic count is recorded for this structure.
How long is RTE I278 over Relief?
The structure is 363 ft (110.6 m) long with a longest span of 64 ft (19.5 m) and a deck 45 ft wide.
Who owns RTE I278 over Relief?
It is owned by the Local Toll Authority.