RTE I84 over Fair Street
FairPutnam County, New York · .6 MI SE I84 Exit 61 · Structure no. 000000001052781
- Built
- 1968
- 57 years old, rebuilt 2006
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 101 ft
- 1 main span
- Daily traffic
- 22,655
- 1996 count
- Owner
- State
- State Highway Agency
About this bridge
RTE I84 over Fair Street is a steel stringer/multi-beam or girder carrying RTE I84 over Fair Street in Putnam County, New York. It was built in 1968 and reconstructed in 2006, so it is 57 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 22,655 vehicles a day, roughly 15% of them trucks. The structure is 101 ft (30.8 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I84 over Fair Street built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 2006.
What condition is RTE I84 over Fair Street in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does RTE I84 over Fair Street carry?
About 22,655 vehicles per day (1996 count), of which roughly 15% are trucks.
How long is RTE I84 over Fair Street?
The structure is 101 ft (30.8 m) long with a longest span of 95 ft (28.9 m) and a deck 43 ft wide.
Who owns RTE I84 over Fair Street?
It is owned by the State Highway Agency.