RTE 9D over Foundry Brook
FairPutnam County, New York · 3.4 MI.S.JCT.RTS.9D&301 · Structure no. 000000001006310
- Built
- 1929
- 96 years old, rebuilt 1985
- Condition
- Fair
- inspected June 2024
- Type
- Arch - Deck
- Steel
- Length
- 240 ft
- 1 main span
- Daily traffic
- 7,200
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 9D over Foundry Brook is a steel arch - deck carrying RTE 9D over Foundry Brook in Putnam County, New York. It was built in 1929 and reconstructed in 1985, so it is 96 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,200 vehicles a day, roughly 2% of them trucks, projected to reach 7,511 by 2041. The structure is 240 ft (73.2 m) long and 32 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 9D over Foundry Brook built?
It was built in 1929, making it 96 years old in 2025. It was reconstructed in 1985.
What condition is RTE 9D over Foundry Brook in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does RTE 9D over Foundry Brook carry?
About 7,200 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is RTE 9D over Foundry Brook?
The structure is 240 ft (73.2 m) long with a longest span of 134 ft (40.8 m) and a deck 32 ft wide.
Who owns RTE 9D over Foundry Brook?
It is owned by the State Highway Agency.