US Bridges

RTE 6 over Mnrr Ha Line

Good

Putnam County, New York · 0.9 MI W JCT Rts 6+22+202 · Structure no. 000000001003510

Built
2021
4 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
107 ft
1 main span
Daily traffic
8,657
2020 count
Owner
Railroad
Railroad

About this bridge

RTE 6 over Mnrr Ha Line is a steel stringer/multi-beam or girder carrying RTE 6 over Mnrr Ha Line in Putnam County, New York. It was built in 2021, so it is 4 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,657 vehicles a day, roughly 5% of them trucks, projected to reach 8,697 by 2041. The structure is 107 ft (32.6 m) long and 60 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRTE 6
CrossesMnrr Ha Line
Location0.9 MI W JCT Rts 6+22+202
RouteU.S. Route 6
Coordinates41.39821, -73.6202
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating82 US tons
Inventory rating49.1 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length107 ft (32.6 m)
Longest span102 ft (31.1 m)
Deck width60 ft (18.3 m)
Roadway width46 ft (14 m)
Vertical clearance over deck107 ft (32.7 m)

Traffic and service

Average daily traffic8,657 (2020)
Projected traffic8,697 by 2041
Trucks5%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerRailroad
Maintained byRailroad
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$5.3 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was RTE 6 over Mnrr Ha Line built?

It was built in 2021, making it 4 years old in 2025.

What condition is RTE 6 over Mnrr Ha Line in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does RTE 6 over Mnrr Ha Line carry?

About 8,657 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is RTE 6 over Mnrr Ha Line?

The structure is 107 ft (32.6 m) long with a longest span of 102 ft (31.1 m) and a deck 60 ft wide.

Who owns RTE 6 over Mnrr Ha Line?

It is owned by the Railroad.