RTE 6 over Bike Path
GoodPutnam County, New York · 1.4 MI E JCT US 6 & SH 52 · Structure no. 000000001003480
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected July 2023
- Type
- Culvert
- Concrete
- Length
- 25 ft
- 1 main span
- Daily traffic
- 15,679
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 6 over Bike Path is a concrete culvert carrying RTE 6 over Bike Path in Putnam County, New York. It was built in 2009, so it is 16 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 15,679 vehicles a day, roughly 4% of them trucks, projected to reach 15,752 by 2041. The structure is 25 ft (7.6 m) long. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 6 over Bike Path built?
It was built in 2009, making it 16 years old in 2025.
What condition is RTE 6 over Bike Path in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does RTE 6 over Bike Path carry?
About 15,679 vehicles per day (2020 count), of which roughly 4% are trucks.
How long is RTE 6 over Bike Path?
The structure is 25 ft (7.6 m) long with a longest span of 21 ft (6.4 m).
Who owns RTE 6 over Bike Path?
It is owned by the State Highway Agency.