US Bridges

County Road 11D over Otego Creek

Fair

Otsego County, New York · Hamlet of South Hartwick · Structure no. 000000003353900

Built
2007
18 years old
Condition
Fair
inspected April 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
44 ft
1 main span
Daily traffic
119
2021 count
Owner
County
County Highway Agency

About this bridge

County Road 11D over Otego Creek is a prestressed concrete box beam or girders - multiple carrying County Road 11D over Otego Creek in Otsego County, New York. It was built in 2007, so it is 18 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 119 vehicles a day, roughly 7% of them trucks, projected to reach 167 by 2041. The structure is 44 ft (13.4 m) long and 33 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCounty Road 11D
CrossesOtego Creek
LocationHamlet of South Hartwick
RouteCounty Highway 0
Coordinates42.61643, -75.05748
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating54 US tons
Inventory rating32 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length44 ft (13.4 m)
Longest span43 ft (13.1 m)
Deck width33 ft (10.2 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic119 (2021)
Projected traffic167 by 2041
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$772,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was County Road 11D over Otego Creek built?

It was built in 2007, making it 18 years old in 2025.

What condition is County Road 11D over Otego Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does County Road 11D over Otego Creek carry?

About 119 vehicles per day (2021 count), of which roughly 7% are trucks.

How long is County Road 11D over Otego Creek?

The structure is 44 ft (13.4 m) long with a longest span of 43 ft (13.1 m) and a deck 33 ft wide.

Who owns County Road 11D over Otego Creek?

It is owned by the County Highway Agency.