County Road 8 over Otego Creek
FairPosted for loadOtsego County, New York · 0.8 MI W of West Oneonta · Structure no. 000000003353820
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 122 ft
- 3 main spans
- Daily traffic
- 1,400
- 2017 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 8 over Otego Creek is a steel continuous stringer/multi-beam or girder carrying County Road 8 over Otego Creek in Otsego County, New York. It was built in 1970, so it is 55 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 1,400 vehicles a day, roughly 4% of them trucks, projected to reach 1,960 by 2037. The structure is 122 ft (37.2 m) long and 33 ft wide. If it were closed, the detour would be 15.5 mi (25 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 8 over Otego Creek built?
It was built in 1970, making it 55 years old in 2025.
What condition is County Road 8 over Otego Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does County Road 8 over Otego Creek carry?
About 1,400 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is County Road 8 over Otego Creek?
The structure is 122 ft (37.2 m) long with a longest span of 54 ft (16.4 m) and a deck 33 ft wide.
Who owns County Road 8 over Otego Creek?
It is owned by the County Highway Agency.