US Bridges

RTE I81 over Little Salmon River

Fair

Oswego County, New York · 1.8 MI S JCT I81NB & SH69 · Structure no. 000000001031822

Built
1960
65 years old
Condition
Fair
inspected September 2024
Type
Culvert
Concrete
Length
29 ft
2 main spans
Daily traffic
10,757
2021 count
Owner
State
State Highway Agency

About this bridge

RTE I81 over Little Salmon River is a concrete culvert carrying RTE I81 over Little Salmon River in Oswego County, New York. It was built in 1960, so it is 65 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10,757 vehicles a day, roughly 13% of them trucks, projected to reach 12,058 by 2041. The structure is 29 ft (8.8 m) long. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRTE I81
CrossesLittle Salmon River
Location1.8 MI S JCT I81NB & SH69
RouteInterstate 81
Coordinates43.37731, -76.12131
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating110.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadH 20
Structure length29 ft (8.8 m)
Longest span14 ft (4.2 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,757 (2021)
Projected traffic12,058 by 2041
Trucks13%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$868,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was RTE I81 over Little Salmon River built?

It was built in 1960, making it 65 years old in 2025.

What condition is RTE I81 over Little Salmon River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does RTE I81 over Little Salmon River carry?

About 10,757 vehicles per day (2021 count), of which roughly 13% are trucks.

How long is RTE I81 over Little Salmon River?

The structure is 29 ft (8.8 m) long with a longest span of 14 ft (4.2 m).

Who owns RTE I81 over Little Salmon River?

It is owned by the State Highway Agency.