US Bridges

87IX Exit 16 Ramp over Metro North RR

Fair

Orange County, New York · 1.1 MI S of Central Vlley · Structure no. 000000005520049

Built
1953
72 years old, rebuilt 1995
Condition
Fair
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
163 ft
3 main spans
Daily traffic
2,598
2018 count
Owner
Toll Authority
State Toll Authority

About this bridge

87IX Exit 16 Ramp over Metro North RR is a steel continuous stringer/multi-beam or girder carrying 87IX Exit 16 Ramp over Metro North RR in Orange County, New York. It was built in 1953 and reconstructed in 1995, so it is 72 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,598 vehicles a day, roughly 15% of them trucks, projected to reach 4,399 by 2041. The structure is 163 ft (49.7 m) long and 85 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

Carries87IX Exit 16 Ramp
CrossesMetro North RR
Location1.1 MI S of Central Vlley
RouteInterstate 0
Coordinates41.31197, -74.12392
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating80 US tons
Inventory rating47 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length163 ft (49.7 m)
Longest span54 ft (16.5 m)
Deck width85 ft (26 m)
Roadway width78 ft (23.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,598 (2018)
Projected traffic4,399 by 2041
Trucks15%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed0.6 mi (1 km)
TollOn an Interstate toll segment under Secretarial agreement
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusHistorical significance not determinable at this time
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$9.9 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was 87IX Exit 16 Ramp over Metro North RR built?

It was built in 1953, making it 72 years old in 2025. It was reconstructed in 1995.

What condition is 87IX Exit 16 Ramp over Metro North RR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does 87IX Exit 16 Ramp over Metro North RR carry?

About 2,598 vehicles per day (2018 count), of which roughly 15% are trucks.

How long is 87IX Exit 16 Ramp over Metro North RR?

The structure is 163 ft (49.7 m) long with a longest span of 54 ft (16.5 m) and a deck 85 ft wide.

Who owns 87IX Exit 16 Ramp over Metro North RR?

It is owned by the State Toll Authority.