US Bridges

RTE 84 over Heritage Trail Mcveigh

Good

Orange County, New York · 1.1 MI East Exit 3 of I84 · Structure no. 000000001052501

Built
2022
3 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
70 ft
1 main span
Daily traffic
17,691
2020 count
Owner
State
State Highway Agency

About this bridge

RTE 84 over Heritage Trail Mcveigh is a steel stringer/multi-beam or girder carrying RTE 84 over Heritage Trail Mcveigh in Orange County, New York. It was built in 2022, so it is 3 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,691 vehicles a day, roughly 21% of them trucks, projected to reach 29,957 by 2041. The structure is 70 ft (21.3 m) long and 46 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRTE 84
CrossesHeritage Trail Mcveigh
Location1.1 MI East Exit 3 of I84
RouteInterstate 84
Coordinates41.42156, -74.40474
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating88 US tons
Inventory rating53 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length70 ft (21.3 m)
Longest span63 ft (19.2 m)
Deck width46 ft (14.1 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deck107 ft (32.7 m)

Traffic and service

Average daily traffic17,691 (2020)
Projected traffic29,957 by 2041
Trucks21%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$4.6 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was RTE 84 over Heritage Trail Mcveigh built?

It was built in 2022, making it 3 years old in 2025.

What condition is RTE 84 over Heritage Trail Mcveigh in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does RTE 84 over Heritage Trail Mcveigh carry?

About 17,691 vehicles per day (2020 count), of which roughly 21% are trucks.

How long is RTE 84 over Heritage Trail Mcveigh?

The structure is 70 ft (21.3 m) long with a longest span of 63 ft (19.2 m) and a deck 46 ft wide.

Who owns RTE 84 over Heritage Trail Mcveigh?

It is owned by the State Highway Agency.