US Bridges

Willow Avenue over 9W 9W83021122 RTE 9W

Good

Orange County, New York · .6 MI SW JCT US9W & SH218 · Structure no. 000000001007230

Built
2020
5 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
115 ft
1 main span
Daily traffic
1,194
2021 count
Owner
State
State Highway Agency

About this bridge

Willow Avenue over 9W 9W83021122 RTE 9W is a steel stringer/multi-beam or girder carrying Willow Avenue over 9W 9W83021122 RTE 9W in Orange County, New York. It was built in 2020, so it is 5 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,194 vehicles a day, roughly 3% of them trucks, projected to reach 1,477 by 2041. The structure is 115 ft (34.9 m) long and 39 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesWillow Avenue
Crosses9W 9W83021122 RTE 9W
Location.6 MI SW JCT US9W & SH218
RouteCounty Highway 0
Coordinates41.44148, -74.04159
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating110.1 US tons
Inventory rating80 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadH 20
Structure length115 ft (34.9 m)
Longest span108 ft (32.9 m)
Deck width39 ft (11.9 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,194 (2021)
Projected traffic1,477 by 2041
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$4.6 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Willow Avenue over 9W 9W83021122 RTE 9W built?

It was built in 2020, making it 5 years old in 2025.

What condition is Willow Avenue over 9W 9W83021122 RTE 9W in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Willow Avenue over 9W 9W83021122 RTE 9W carry?

About 1,194 vehicles per day (2021 count), of which roughly 3% are trucks.

How long is Willow Avenue over 9W 9W83021122 RTE 9W?

The structure is 115 ft (34.9 m) long with a longest span of 108 ft (32.9 m) and a deck 39 ft wide.

Who owns Willow Avenue over 9W 9W83021122 RTE 9W?

It is owned by the State Highway Agency.