US Bridges

Tileyard Road over Flint Creek

Good

Ontario County, New York · 1.9 Miles North of Gorham · Structure no. 000000003318320

Built
2024
1 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
92 ft
1 main span
Daily traffic
59
2019 count
Owner
County
County Highway Agency

About this bridge

Tileyard Road over Flint Creek is a steel stringer/multi-beam or girder carrying Tileyard Road over Flint Creek in Ontario County, New York. It was built in 2024, so it is 1 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 59 vehicles a day, roughly 7% of them trucks, projected to reach 83 by 2039. The structure is 92 ft (28 m) long and 35 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTileyard Road
CrossesFlint Creek
Location1.9 Miles North of Gorham
Coordinates42.8254, -77.12423
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating77.1 US tons
Inventory rating46 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length92 ft (28 m)
Longest span87 ft (26.5 m)
Deck width35 ft (10.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deck107 ft (32.7 m)

Traffic and service

Average daily traffic59 (2019)
Projected traffic83 by 2039
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Tileyard Road over Flint Creek built?

It was built in 2024, making it 1 years old in 2025.

What condition is Tileyard Road over Flint Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Tileyard Road over Flint Creek carry?

About 59 vehicles per day (2019 count), of which roughly 7% are trucks.

How long is Tileyard Road over Flint Creek?

The structure is 92 ft (28 m) long with a longest span of 87 ft (26.5 m) and a deck 35 ft wide.

Who owns Tileyard Road over Flint Creek?

It is owned by the County Highway Agency.