US Bridges

Brace Road over Fish Creek

Fair

Ontario County, New York · 3 MI S of Victor · Structure no. 000000002258020

Built
1978
47 years old
Condition
Fair
inspected April 2023
Type
Culvert
Aluminum, Wrought Iron, or Cast Iron
Length
30 ft
2 main spans
Daily traffic
2,775
2020 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Brace Road over Fish Creek is a aluminum, wrought iron, or cast iron culvert carrying Brace Road over Fish Creek in Ontario County, New York. It was built in 1978, so it is 47 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,775 vehicles a day, roughly 3% of them trucks, projected to reach 3,885 by 2040. The structure is 30 ft (9.1 m) long. If it were closed, the detour would be 2.5 mi (4 km).

CarriesBrace Road
CrossesFish Creek
Location3 MI S of Victor
Coordinates42.94379, -77.38953
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82.8 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialAluminum, Wrought Iron, or Cast Iron
DeckNot applicable
Main spans2
Design loadUnknown
Structure length30 ft (9.1 m)
Longest span12 ft (3.6 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,775 (2020)
Projected traffic3,885 by 2040
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$286,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Brace Road over Fish Creek built?

It was built in 1978, making it 47 years old in 2025.

What condition is Brace Road over Fish Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does Brace Road over Fish Creek carry?

About 2,775 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is Brace Road over Fish Creek?

The structure is 30 ft (9.1 m) long with a longest span of 12 ft (3.6 m).

Who owns Brace Road over Fish Creek?

It is owned by the Town or Township Highway Agency.