US Bridges

RTE 5 over Sucker Brook

Fair

Ontario County, New York · 0.5 MI S JCT RT21&RTS5&20 · Structure no. 000000001071190

Built
1980
45 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
82 ft
1 main span
Daily traffic
13,650
2019 count
Owner
State
State Highway Agency

About this bridge

RTE 5 over Sucker Brook is a steel stringer/multi-beam or girder carrying RTE 5 over Sucker Brook in Ontario County, New York. It was built in 1980, so it is 45 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 13,650 vehicles a day, roughly 6% of them trucks, projected to reach 14,238 by 2041. The structure is 82 ft (25 m) long and 63 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRTE 5
CrossesSucker Brook
Location0.5 MI S JCT RT21&RTS5&20
RouteState Highway 5
Coordinates42.87786, -77.27817
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating94 US tons
Inventory rating56 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length82 ft (25 m)
Longest span77 ft (23.4 m)
Deck width63 ft (19.2 m)
Roadway width61 ft (18.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,650 (2019)
Projected traffic14,238 by 2041
Trucks6%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$2.8 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was RTE 5 over Sucker Brook built?

It was built in 1980, making it 45 years old in 2025.

What condition is RTE 5 over Sucker Brook in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does RTE 5 over Sucker Brook carry?

About 13,650 vehicles per day (2019 count), of which roughly 6% are trucks.

How long is RTE 5 over Sucker Brook?

The structure is 82 ft (25 m) long with a longest span of 77 ft (23.4 m) and a deck 63 ft wide.

Who owns RTE 5 over Sucker Brook?

It is owned by the State Highway Agency.