RTE 96 over Ontario Centrl RR Great
FairOntario County, New York · 2.2 MI W JCT SH96 & SH332 · Structure no. 000000001035160
- Built
- 2008
- 17 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 323 ft
- 3 main spans
- Daily traffic
- 15,252
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 96 over Ontario Centrl RR Great is a steel continuous stringer/multi-beam or girder carrying RTE 96 over Ontario Centrl RR Great in Ontario County, New York. It was built in 2008, so it is 17 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,252 vehicles a day, roughly 5% of them trucks, projected to reach 15,323 by 2041. The structure is 323 ft (98.5 m) long and 45 ft wide. If it were closed, the detour would be 19.9 mi (32 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 96 over Ontario Centrl RR Great built?
It was built in 2008, making it 17 years old in 2025.
What condition is RTE 96 over Ontario Centrl RR Great in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does RTE 96 over Ontario Centrl RR Great carry?
About 15,252 vehicles per day (2021 count), of which roughly 5% are trucks.
How long is RTE 96 over Ontario Centrl RR Great?
The structure is 323 ft (98.5 m) long with a longest span of 150 ft (45.7 m) and a deck 45 ft wide.
Who owns RTE 96 over Ontario Centrl RR Great?
It is owned by the State Highway Agency.