US Bridges

Exit 37 Ramp over 90IX RTE I90

Good

Onondaga County, New York · Ramp Bridge Exit 37 I90 · Structure no. 000000005510160

Built
2020
5 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
219 ft
2 main spans
Daily traffic
1,926
2019 count
Owner
Toll Authority
State Toll Authority

About this bridge

Exit 37 Ramp over 90IX RTE I90 is a steel stringer/multi-beam or girder carrying Exit 37 Ramp over 90IX RTE I90 in Onondaga County, New York. It was built in 2020, so it is 5 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,926 vehicles a day, roughly 8% of them trucks, projected to reach 2,778 by 2041. The structure is 219 ft (66.8 m) long and 56 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesExit 37 Ramp
Crosses90IX RTE I90
LocationRamp Bridge Exit 37 I90
RouteInterstate 0
Coordinates43.10214, -76.18131
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating83 US tons
Inventory rating50 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length219 ft (66.8 m)
Longest span113 ft (34.4 m)
Deck width56 ft (17 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,926 (2019)
Projected traffic2,778 by 2041
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn an Interstate toll segment under Secretarial agreement
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusHistorical significance not determinable at this time
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$4.3 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Exit 37 Ramp over 90IX RTE I90 built?

It was built in 2020, making it 5 years old in 2025.

What condition is Exit 37 Ramp over 90IX RTE I90 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Exit 37 Ramp over 90IX RTE I90 carry?

About 1,926 vehicles per day (2019 count), of which roughly 8% are trucks.

How long is Exit 37 Ramp over 90IX RTE I90?

The structure is 219 ft (66.8 m) long with a longest span of 113 ft (34.4 m) and a deck 56 ft wide.

Who owns Exit 37 Ramp over 90IX RTE I90?

It is owned by the State Toll Authority.