CR57 over 90IX RTE I90
FairOnondaga County, New York · 0.3MI E Exit 38 over I90 · Structure no. 000000005027410
- Built
- 1952
- 73 years old, rebuilt 1987
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 169 ft
- 2 main spans
- Daily traffic
- 16,723
- 2021 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
CR57 over 90IX RTE I90 is a steel stringer/multi-beam or girder carrying CR57 over 90IX RTE I90 in Onondaga County, New York. It was built in 1952 and reconstructed in 1987, so it is 73 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16,723 vehicles a day, roughly 3% of them trucks, projected to reach 16,801 by 2041. The structure is 169 ft (51.5 m) long and 66 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR57 over 90IX RTE I90 built?
It was built in 1952, making it 73 years old in 2025. It was reconstructed in 1987.
What condition is CR57 over 90IX RTE I90 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does CR57 over 90IX RTE I90 carry?
About 16,723 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is CR57 over 90IX RTE I90?
The structure is 169 ft (51.5 m) long with a longest span of 84 ft (25.6 m) and a deck 66 ft wide.
Who owns CR57 over 90IX RTE I90?
It is owned by the State Toll Authority.