Salina-Dewitt Road over Ley Creek
FairOnondaga County, New York · 1.3 MI W Exit 35 of I90 · Structure no. 000000003312790
- Built
- 1951
- 74 years old, rebuilt 2006
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 57 ft
- 1 main span
- Daily traffic
- 6,405
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Salina-Dewitt Road over Ley Creek is a steel stringer/multi-beam or girder carrying Salina-Dewitt Road over Ley Creek in Onondaga County, New York. It was built in 1951 and reconstructed in 2006, so it is 74 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,405 vehicles a day, roughly 7% of them trucks, projected to reach 7,780 by 2041. The structure is 57 ft (17.4 m) long and 70 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Salina-Dewitt Road over Ley Creek built?
It was built in 1951, making it 74 years old in 2025. It was reconstructed in 2006.
What condition is Salina-Dewitt Road over Ley Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Salina-Dewitt Road over Ley Creek carry?
About 6,405 vehicles per day (2021 count), of which roughly 7% are trucks.
How long is Salina-Dewitt Road over Ley Creek?
The structure is 57 ft (17.4 m) long with a longest span of 53 ft (16.3 m) and a deck 70 ft wide.
Who owns Salina-Dewitt Road over Ley Creek?
It is owned by the County Highway Agency.