US Bridges

RTE I690 over Peat Street

Fair

Onondaga County, New York · 0.3 MI E JCT I-690+ Teall · Structure no. 000000001051159

Built
1968
57 years old, rebuilt 2012
Condition
Fair
inspected April 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
79 ft
1 main span
Daily traffic
74,137
2018 count
Owner
State
State Highway Agency

About this bridge

RTE I690 over Peat Street is a steel stringer/multi-beam or girder carrying RTE I690 over Peat Street in Onondaga County, New York. It was built in 1968 and reconstructed in 2012, so it is 57 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 74,137 vehicles a day, roughly 3% of them trucks, projected to reach 106,942 by 2041. The structure is 79 ft (24.1 m) long and 102 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRTE I690
CrossesPeat Street
Location0.3 MI E JCT I-690+ Teall
RouteInterstate 690
Coordinates43.05478, -76.11559
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating71 US tons

Structure

MaterialSteel
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length79 ft (24.1 m)
Longest span72 ft (21.9 m)
Deck width102 ft (31.2 m)
Roadway width97 ft (29.5 m)
Vertical clearance over deck22 ft (6.8 m)

Traffic and service

Average daily traffic74,137 (2018)
Projected traffic106,942 by 2041
Trucks3%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$5.3 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was RTE I690 over Peat Street built?

It was built in 1968, making it 57 years old in 2025. It was reconstructed in 2012.

What condition is RTE I690 over Peat Street in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does RTE I690 over Peat Street carry?

About 74,137 vehicles per day (2018 count), of which roughly 3% are trucks.

How long is RTE I690 over Peat Street?

The structure is 79 ft (24.1 m) long with a longest span of 72 ft (21.9 m) and a deck 102 ft wide.

Who owns RTE I690 over Peat Street?

It is owned by the State Highway Agency.