RTE I90 over CSX Trans/Amtrak Stony
FairOneida County, New York · 0.81 MI W of Int 33 I-90 · Structure no. 000000005512919
- Built
- 1952
- 73 years old, rebuilt 2017
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 291 ft
- 3 main spans
- Daily traffic
- 31,289
- 2020 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
RTE I90 over CSX Trans/Amtrak Stony is a steel stringer/multi-beam or girder carrying RTE I90 over CSX Trans/Amtrak Stony in Oneida County, New York. It was built in 1952 and reconstructed in 2017, so it is 73 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 31,289 vehicles a day, roughly 23% of them trucks, projected to reach 34,802 by 2041. The structure is 291 ft (88.7 m) long and 113 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I90 over CSX Trans/Amtrak Stony built?
It was built in 1952, making it 73 years old in 2025. It was reconstructed in 2017.
What condition is RTE I90 over CSX Trans/Amtrak Stony in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does RTE I90 over CSX Trans/Amtrak Stony carry?
About 31,289 vehicles per day (2020 count), of which roughly 23% are trucks.
How long is RTE I90 over CSX Trans/Amtrak Stony?
The structure is 291 ft (88.7 m) long with a longest span of 111 ft (33.8 m) and a deck 113 ft wide.
Who owns RTE I90 over CSX Trans/Amtrak Stony?
It is owned by the State Toll Authority.