US Bridges

Grant Road over White Creek

Good

Oneida County, New York · Town of Kirkland · Structure no. 000000002271470

Built
2019
6 years old
Condition
Good
inspected October 2023
Type
Culvert
Aluminum, Wrought Iron, or Cast Iron
Length
30 ft
1 main span
Daily traffic
343
2020 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Grant Road over White Creek is a aluminum, wrought iron, or cast iron culvert carrying Grant Road over White Creek in Oneida County, New York. It was built in 2019, so it is 6 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 343 vehicles a day, roughly 4% of them trucks, projected to reach 480 by 2040. The structure is 30 ft (9.1 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesGrant Road
CrossesWhite Creek
LocationTown of Kirkland
Coordinates43.03617, -75.39021
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert9 ExcellentNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating86.9 US tons
Inventory rating45 US tons

Structure

Structure typeCulvert
MaterialAluminum, Wrought Iron, or Cast Iron
DeckNot applicable
Main spans1
Design loadHS 25 or greater
Structure length30 ft (9.1 m)
Longest span29 ft (8.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deck107 ft (32.7 m)

Traffic and service

Average daily traffic343 (2020)
Projected traffic480 by 2040
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$238,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Grant Road over White Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is Grant Road over White Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Grant Road over White Creek carry?

About 343 vehicles per day (2020 count), of which roughly 4% are trucks.

How long is Grant Road over White Creek?

The structure is 30 ft (9.1 m) long with a longest span of 29 ft (8.8 m).

Who owns Grant Road over White Creek?

It is owned by the Town or Township Highway Agency.