NB Ramp to 921C N over Main Street Relief Wat
FairOneida County, New York · .2 MI N JCT SH 5S & 921C · Structure no. 00000000109050A
- Built
- 1973
- 52 years old, rebuilt 2009
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 379 ft
- 4 main spans
- Daily traffic
- 9,230
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
NB Ramp to 921C N over Main Street Relief Wat is a steel stringer/multi-beam or girder carrying NB Ramp to 921C N over Main Street Relief Wat in Oneida County, New York. It was built in 1973 and reconstructed in 2009, so it is 52 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,230 vehicles a day, roughly 6% of them trucks, projected to reach 9,273 by 2041. The structure is 379 ft (115.5 m) long and 36 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NB Ramp to 921C N over Main Street Relief Wat built?
It was built in 1973, making it 52 years old in 2025. It was reconstructed in 2009.
What condition is NB Ramp to 921C N over Main Street Relief Wat in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does NB Ramp to 921C N over Main Street Relief Wat carry?
About 9,230 vehicles per day (2017 count), of which roughly 6% are trucks.
How long is NB Ramp to 921C N over Main Street Relief Wat?
The structure is 379 ft (115.5 m) long with a longest span of 101 ft (30.7 m) and a deck 36 ft wide.
Who owns NB Ramp to 921C N over Main Street Relief Wat?
It is owned by the State Highway Agency.