US Bridges

Middle Settlement over 840 840 26011016 RTE 84

Good

Oneida County, New York · 1.7 MI NW JCT SH 8 & SH12 · Structure no. 000000001077640

Built
2005
20 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
186 ft
2 main spans
Daily traffic
10,655
2018 count
Owner
State
State Highway Agency

About this bridge

Middle Settlement over 840 840 26011016 RTE 84 is a steel stringer/multi-beam or girder carrying Middle Settlement over 840 840 26011016 RTE 84 in Oneida County, New York. It was built in 2005, so it is 20 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,655 vehicles a day, roughly 3% of them trucks, projected to reach 12,943 by 2041. The structure is 186 ft (56.7 m) long and 48 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesMiddle Settlement
Crosses840 840 26011016 RTE 84
Location1.7 MI NW JCT SH 8 & SH12
RouteCounty Highway 0
Coordinates43.09323, -75.3185
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating86 US tons
Inventory rating51 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans2
Design loadHS 25 or greater
Structure length186 ft (56.7 m)
Longest span94 ft (28.6 m)
Deck width48 ft (14.5 m)
Roadway width38 ft (11.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,655 (2018)
Projected traffic12,943 by 2041
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$3 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Middle Settlement over 840 840 26011016 RTE 84 built?

It was built in 2005, making it 20 years old in 2025.

What condition is Middle Settlement over 840 840 26011016 RTE 84 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Middle Settlement over 840 840 26011016 RTE 84 carry?

About 10,655 vehicles per day (2018 count), of which roughly 3% are trucks.

How long is Middle Settlement over 840 840 26011016 RTE 84?

The structure is 186 ft (56.7 m) long with a longest span of 94 ft (28.6 m) and a deck 48 ft wide.

Who owns Middle Settlement over 840 840 26011016 RTE 84?

It is owned by the State Highway Agency.