RTE 9A over Henry Hudson Parkway Sou
FairNew York County, New York · SH 9A & Spuyten Duyvil Ck · Structure no. 000000005521258
- Built
- 1937
- 88 years old, rebuilt 2020
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 2,409 ft
- 69 main spans
- Daily traffic
- 77,015
- 2019 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
RTE 9A over Henry Hudson Parkway Sou is a steel stringer/multi-beam or girder carrying RTE 9A over Henry Hudson Parkway Sou in New York County, New York. It was built in 1937 and reconstructed in 2020, so it is 88 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 77,015 vehicles a day, roughly 1% of them trucks, projected to reach 94,959 by 2041. The structure is 2,409 ft (734.3 m) long and 52 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 9A over Henry Hudson Parkway Sou built?
It was built in 1937, making it 88 years old in 2025. It was reconstructed in 2020.
What condition is RTE 9A over Henry Hudson Parkway Sou in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does RTE 9A over Henry Hudson Parkway Sou carry?
About 77,015 vehicles per day (2019 count), of which roughly 1% are trucks.
How long is RTE 9A over Henry Hudson Parkway Sou?
The structure is 2,409 ft (734.3 m) long with a longest span of 108 ft (32.9 m) and a deck 52 ft wide.
Who owns RTE 9A over Henry Hudson Parkway Sou?
It is owned by the Local Toll Authority.