RTE 9A over 59th Street Relief
FairPosted for loadNew York County, New York · West Side Highway-W 59 ST · Structure no. 000000002257569
- Built
- 1931
- 94 years old, rebuilt 1995
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 3,633 ft
- 4 main spans
- Daily traffic
- 95,281
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
RTE 9A over 59th Street Relief is a steel stringer/multi-beam or girder carrying RTE 9A over 59th Street Relief in New York County, New York. It was built in 1931 and reconstructed in 1995, so it is 94 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 95,281 vehicles a day, roughly 2% of them trucks, projected to reach 117,481 by 2041. The structure is 3,633 ft (1,107.3 m) long and 75 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 9A over 59th Street Relief built?
It was built in 1931, making it 94 years old in 2025. It was reconstructed in 1995.
What condition is RTE 9A over 59th Street Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does RTE 9A over 59th Street Relief carry?
About 95,281 vehicles per day (2020 count), of which roughly 2% are trucks.
How long is RTE 9A over 59th Street Relief?
The structure is 3,633 ft (1,107.3 m) long with a longest span of 113 ft (34.4 m) and a deck 75 ft wide.
Who owns RTE 9A over 59th Street Relief?
It is owned by the City or Municipal Highway Agency.