US Bridges

RTE 907V over Relief

Fair

New York County, New York · 6.4 MI NE JCT SH9A&79THST · Structure no. 00000000222943A

Built
1939
86 years old, rebuilt 1986
Condition
Fair
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
122 ft
6 main spans
Daily traffic
—
2019 count
Owner
State
State Highway Agency

About this bridge

RTE 907V over Relief is a steel stringer/multi-beam or girder carrying RTE 907V over Relief in New York County, New York. It was built in 1939 and reconstructed in 1986, so it is 86 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

No traffic count is recorded. The structure is 122 ft (37.1 m) long and 23 ft wide.

CarriesRTE 907V
CrossesRelief
Location6.4 MI NE JCT SH9A&79THST
RouteCity Street 907V
Coordinates40.86675, -73.93226
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56 US tons
Inventory rating34 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans6
Design loadUnknown
Structure length122 ft (37.1 m)
Longest span21 ft (6.4 m)
Deck width23 ft (7 m)
Roadway width19 ft (5.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic—
Projected traffic—
Trucks1%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedDeck replacement with only incidental widening
Estimated improvement cost$2.5 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was RTE 907V over Relief built?

It was built in 1939, making it 86 years old in 2025. It was reconstructed in 1986.

What condition is RTE 907V over Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does RTE 907V over Relief carry?

No traffic count is recorded for this structure.

How long is RTE 907V over Relief?

The structure is 122 ft (37.1 m) long with a longest span of 21 ft (6.4 m) and a deck 23 ft wide.

Who owns RTE 907V over Relief?

It is owned by the State Highway Agency.